Bag Prototyping Revision Log & Tech Pack Checklist

One printable working document: the engineering brief fields, the tech pack document set, the revision log columns with severity rules, and the golden sample sign-off list. Built from the same process we run on the LantaoBags sample-room floor.

1Engineering brief — lock these before sampling

2Tech pack document set

1Design Brief
2BOM Sheet
3Material & Color Reference
4Hardware Spec Sheet
5Construction Callouts
6Measurement & Tolerance
7Branding, Packaging & QC
8Revision Log & Sign-Off

3Test gates to define in the tech pack

CheckTarget to agreeWhy it matters
Handle / strap anchorLoad to failure, then retestReveals weak reinforcement and stitch pattern
Zipper cycle500 open / close cyclesExposes drag, misalignment and slider wear
Seam and tolerance±5 mm on key measurementsStops dimension drift between rounds and bulk
Hardware corrosionSalt-spray checkFlags finish failures before they reach the customer
Loaded carryTarget capacity, 30-minute carryShows foam collapse, strap dig and silhouette loss

4Revision log — one row per defect

#IssuePhoto refProbable causeCorrective actionSeverityOwner / due
1Strap anchor tears at loadIMG-01Single stitch row, no backerAdd PVC backer, X-box stitchCritical 
2Base panel 6 mm oversizeIMG-02Seam allowance not statedLock seam allowance in tech packMajor 
3Zipper twists at cornerIMG-03Four-layer seam stackThin binding, revise gussetMajor 
4Edge-paint gloss unevenIMG-04Surface prep skippedAdd prep step and drying timeMinor 
5      
6      
7      
8      

Severity rule: Critical = structural failure (tear-out, zipper blowout); Major = fit, dimension or function drift; Minor = cosmetic. Change one variable per defect category per round.

5Golden sample sign-off