Container Loading Supervision Checklist

Seven-step dock SOP โ€” print one sheet per container and sign every gate before the seal goes on.

0Container and gate record

Container number: ______________
Date / time: ______________
Lead inspector: ______________
Weather: ______________
Forwarder / booking: ______________
Stop-loading owner: ______________

1Freeze the document set

2Inspect the container (7 points)

3Open random cartons and check moisture

Lowest reading: ______ %
Highest reading: ______ % (stop above 12%)

4Count every carton at the door

5Load by weight, protect the bottom layer

6Secure the load and control moisture

7Seal the container, lock the evidence

Stop the load if: the count does not match the packing list, a roof pinhole or wet floor is found, moisture reads above 12%, an unmarked or over/short carton appears, a column leans or the load shifts, or the evidence package is incomplete.